CS605 Assignment No 01 Solution & Discussion Due Date: Nov 06, 2017

CS605 - Software Engineering II Assignment No. 1 Solution Fall 2017 Due Date: Nov 06, 2017 

                          Assignment No. 01
                        Semester: Fall 2017

CS605: Software Engineering II

Total Marks: 15

 

Due Date: 6th-Nov 2017

 

Instructions:

Please read the following instructions carefully before submitting assignment:

You need to use MS word document to prepare and submit the assignment on VU-LMS.

It should be clear that your assignment will not get any credit if:

 

  • The assignment is submitted after due date.
  • The assignment is not in the required format (.doc or docx)
  • The submitted assignment does not open or file is corrupt.
  • Assignment is copied(partial or full) from any source (websites, forums, students, etc)

 

 

 

Learning Outcome:

After completing this assignment the student will be able to:

  • Identify Capability Maturity Model (CMM) level as per scenario.
  • Select appropriate Software Development Life Cycle (SDLC) model as per given requirements.

 

 

Note 

  • This assignment is a Graded Assignment.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Assignment 

 

 

Question No. 1                                                                                                                          5 Marks

 

Suppose you are working in a software development company as a project manager.  This company is currently working on a project of developing software system for space crafts. The project is associated with very high risk element.  As a project manager which Software Development Life Cycle model you will choose for above scenario to complete the task.

 

Name the lifecycle model with proper reason.

 

Question No. 2                                                                                                                          5 Marks

 

For a software development project the project manager has chosen a Software Lifecycle model in which the product is constructed without specification or any effort at design. The developers just build a product that is revised as many times as necessary to satisfy the client.

 

For the above scenario answer the following questions:

 

a)      Name the Software Life Cycle Model that is chosen in above scenario?

b)      For which type of projects the above life cycle model may work?

           

Question No. 3                                                                                                                          5 Marks

 

Alibaba is well established software house which is performing its operations very efficiently.

For continuous process improvement, Alibaba takes qualitative feedback from the processes and tests innovative ideas and technologies on regular basis.

 

Identify the CMM level for Alibaba and write any two KPAs of this level.

Share This With Friends......


How to Find Your Subject Study Group & Join.

Find Your Subject Study Group & Join.

+ Click Here To Join also Our facebook study Group.


This Content Originally Published by a member of VU Students.

+ Prohibited Content On Site + Report a violation + Report an Issue


Views: 1341

See Your Saved Posts Timeline

Replies to This Discussion

Please Discuss here about this assignment.Thanks

Our main purpose here discussion not just Solution

We are here with you hands in hands to facilitate your learning and do not appreciate the idea of copying or replicating solutions. Read More>>

 

Note:-

For Important Helping Material related to this subject (Solved MCQs, Short Notes, Solved past Papers, E-Books, FAQ,Short Questions Answers & more). You must view all the featured Discussion in this subject group.

For how you can view all the Featured discussions click on the Back to Subject Name Discussions link below the title of this Discussion & then under featured Discussion corner click on the view all link.

Or visit this link 

Click Here For Detail.

&

.•°How to Download past papers from study groups°•.

 

Please Click on the below link to see…

.... How to Find Your Subject Study Group & Join .... 

 

P.S:    Please always try to add the discussion in proper format title like “CS101 Assignment / GDB No 01 Solution & Discussion Due Date: ___________”

Enjoy 

Here is the complete solution.

Remember me in your prayers !!

Attachments:

what is this solution 100% true?

CS605 Assignment#01 Solution

Attachments:

Assignment No. 01
Semester: Fall 2017
CS605: Software Engineering II
Question No. 1
Suppose you are working in a software development company as a project manager. This company is currently working on a project of developing software system for space craft’s. The project is associated with very high risk element. As a project manager which Software Development Life Cycle model you will choose for above scenario to complete the task.

Name the lifecycle model with proper reason.

Answer:
Spiral Model
Reason:
Spiral model is waterfall plus risk analysis. According to scenario our project is associated with high risk element. If risk cannot be resolved project is immediately terminated.

Question No. 2
For a software development project the project manager has chosen a Software Lifecycle model in which the product is constructed without specification or any effort at design. The developers just build a product that is revised as many times as necessary to satisfy the client.

For the above scenario answer the following questions:

Name the Software Life Cycle Model that is chosen in above scenario?
For which type of projects the above life cycle model may work?

Answer:
Build-and-fix model
In this model the product is constructed without specification or any attempt at design. The developers simply build a product that is reworked as many times as necessary to satisfy the client. This model may work for small projects.

Question No. 3
Alibaba is well established software house which is performing its operations very efficiently.
For continuous process improvement, Alibaba takes qualitative feedback from the processes and tests innovative ideas and technologies on regular basis.
Identify the CMM level for Alibaba and write any two KPAs of this level.

Answer:
CMM level for Alibaba is level-5 Optimizing.
Two KPAs of level-5
Technology change management
Defect prevention

CS605 Assignment#01 Solution 

Attachments:

cs605 assignment no 1 solution fall 2017

Question No. 1                                                                                                                          5 Marks

 

Suppose you are working in a software development company as a project manager.  This company is currently working on a project of developing software system for space crafts. The project is associated with very high risk element.  As a project manager which Software Development Life Cycle model you will choose for above scenario to complete the task.

Answer:

It is spiral model. The spiral model is waterfall model plus risk analysis. According to scenario our project is associated with high risk element. If risk cannot be resolved, project is immediately terminated.

 

Question No. 2                                                                                                                          5 Marks

 

For a software development project the project manager has chosen a Software Lifecycle model in which the product is constructed without specification or any effort at design. The developers just build a product that is revised as many times as necessary to satisfy the client.

 

For the above scenario answer the following questions:

 

  1. Name the Software Life Cycle Model that is chosen in above scenario?

Answer:

                Build and fix model.

  1. For which type of projects the above life cycle model may work?

Answer:

              In this model the product is constructed without specification or any attempt at design. The developers simply build a Product that is reworked as many times as necessary to satiety the client. This model may work for small projects.

 

Question No. 3                                                                                                                          5 Marks

 

Alibaba is well established software house which is performing its operations very efficiently.

For continuous process improvement, Alibaba takes qualitative feedback from the processes and tests innovative ideas and technologies on regular basis.

 

Identify the CMM level for Alibaba and write any two KPAs of this level.

 

Answer:

Level 5- Optimizing: Continuous process improvement is enabled by qualitative feedback from the process and from testing innovative ideas and technologies.

KPAs: Technology change management defect prevention.

 

CS605 Assignment#01 Solution Fall 2017

see the attached file 

Attachments:

thank you sir

Assignment No. 01
Semester: Fall 2017
CS605: Software Engineering II
Question No. 1
Suppose you are working in a software development company as a project manager. This company is currently working on a project of developing software system for space craft’s. The project is associated with very high risk element. As a project manager which Software Development Life Cycle model you will choose for above scenario to complete the task.

Name the lifecycle model with proper reason.

Answer:
Spiral Model
Reason:
Spiral model is waterfall plus risk analysis. According to scenario our project is associated with high risk element. If risk cannot be resolved project is immediately terminated.

Question No. 2
For a software development project the project manager has chosen a Software Lifecycle model in which the product is constructed without specification or any effort at design. The developers just build a product that is revised as many times as necessary to satisfy the client.

For the above scenario answer the following questions:

Name the Software Life Cycle Model that is chosen in above scenario?
For which type of projects the above life cycle model may work?

Answer:
Build-and-fix model
In this model the product is constructed without specification or any attempt at design. The developers simply build a product that is reworked as many times as necessary to satisfy the client. This model may work for small projects.

Question No. 3
Alibaba is well established software house which is performing its operations very efficiently.
For continuous process improvement, Alibaba takes qualitative feedback from the processes and tests innovative ideas and technologies on regular basis.
Identify the CMM level for Alibaba and write any two KPAs of this level.

Answer:
CMM level for Alibaba is level-5 Optimizing.
Two KPAs of level-5
Technology change management
Defect prevention

thank you sir

RSS

Forum Categorizes

Job's & Careers (Latest Jobs)

Admissions (Latest Admissons)

Scholarship (Latest Scholarships)

Internship (Latest Internships)

VU Study

Other Universities/Colleges/Schools Help

    ::::::::::: More Categorizes :::::::::::

Member of The Month

© 2017   Created by + M.Tariq Malik.   Powered by

Promote Us  |  Report an Issue  |  Privacy Policy  |  Terms of Service