Latest Activity In Study Groups

Join Your Study Groups

VU Past Papers, MCQs and More

We non-commercial site working hard since 2009 to facilitate learning Read More. We can't keep up without your support. Donate.


Dear Students,

This is to inform that Graded Discussion Board (GDB) will be opened on 5th July, 2012. Below is the topic for GDB.

 

Despite the importance and focus on SE development model in academic, it is a cruel fact that SE model is not deployed in industry practically but with modifications. What are the reasons behind this? Justify your answer with valid arguments.

 

Note that GDB will remain open for 2 days only (from 5th July to 6th July), and no extra time will be given for posting the answer. Therefore, make sure that you submit your answer within the given time. 

 

For any further queries regarding GDB, you can mail at cs504@vu.edu.pk

Views: 1907

Replies to This Discussion

opn nahi ho rahi

zaheer plz upload file in .doc format

this is  Zaheer idea i just copy and paste here for students

There are many reasons which tell us about that SE model is successfully adopted in academic but not in industry. There are following reasons which may tell us about this cruel fact.

  1. During testing phases model does not explain or provide a clear picture of problems.
  2. Due to the lack of skills it is not implemented successfully.
  3. It is too time and cost consuming.
  4. Its implementation is very difficult.
  5. Poor model requirements are at a moderate to high risk of changing.
  6. The quality SE model for all needs is difficult to design.
  7. Industrial authors want to add lengthy information and introduction which is not easy to do in a SE model.
  8. Methods used in SE model development are formally based but methods used in industry are rarely formally based, they are well developed and understood. In order to incorporate into industrial practice, formal methods must need the current standard.
  9. The criteria used for the evaluation of SE development model are tended to the vague and ambiguous. They are often derived from author experience from a particular project.
  10. With growing of time, there can be many changes in industrial process which lead to the changes in SE model, so changing in SE model is not an easy task. It is very difficult to make changes in SE model. Which discourage the use of SE development model in industry.

thanks a lot

tell me any one                  gdb kitny words ka likhna hy 200 words tak


tell me any one                  gdb kitny words ka likhna hy 200 words tak


file ko rename kr k .docx extention ko .doc bna lo phr open ho ge

tell me any one                  gdb kitny words ka likhna hy 200 words tak

9. The criteria used for the evaluation of SE development model are tended to the vague and ambiguous(...?). plz clear this line vague and ambiguous what?

means not clear,

It's written in announcement that your answer should not exceed than 200 words.

 cs504 gdb solution 2012 


this is idea solution don't copy it
There are many reasons which tell us about that SE model is successfully adopted in academic but not in industry. There are following reasons which may tell us about this cruel fact.
1. During testing phases model does not explain or provide a clear picture of problems.
2. Due to the lack of skills it is not implemented successfully.
3. It is too time and cost consuming.
4. Its implementation is very difficult.
5. Poor model requirements are at a moderate to high risk of changing.
6. The quality SE model for all needs is difficult to design.
7. Industrial authors want to add lengthy information and introduction which is not easy to do in a SE model. 
8. Methods used in SE model development are formally based but methods used in industry are rarely formally based, they are well developed and understood. In order to incorporate into industrial practice, formal methods must need the current standard.
9. The criteria used for the evaluation of SE development model are tended to the vague and ambiguous. They are often derived from author experience from a particular project.
10. With growing of time, there can be many changes in industrial process which lead to the changes in SE model, so changing in SE model is not an easy task. It is very difficult to make changes in SE model. Which discourage the use of SE development model in industry.

RSS

Looking For Something? Search Below

VIP Member Badge & Others

How to Get This Badge at Your Profile DP

------------------------------------

Management: Admins ::: Moderators

Other Awards Badges List Moderators Group

Latest Activity

© 2021   Created by + M.Tariq Malik.   Powered by

Promote Us  |  Report an Issue  |  Privacy Policy  |  Terms of Service