Assignment No. 03
Semester: Spring 2021

CS605 Software Engineering II

 

Total Marks: 10

 

Due Date: 16-07-2021

 

Assignment no. 3 covers Lec#23 to Lec#28.

 

 

Objectives of Assignment:

 

  • You will learn the different concepts relevant to software engineering. 

 

 

Uploading instructions:

 

  • Your assignment must be in .doc or .docx format. (Any other formats like scan images, PDF, Zip, rar, bmp,etc will not be accepted).
  • No assignment will be accepted through email.

 

 

Rules for Marking:

 

It should be clear that your assignment will not get any credit if:

 

·         The assignment is submitted after due date.

·         Did not follow the answer sheet guidelines.

·         The submitted assignment does not open or file is corrupted.

·         Your assignment is copied from internet, handouts or from any other student

      (Strict disciplinary action will be taken in any of these cases).

 

 

Assignment

 

 

 

 

 

Question No 1:                                                                                                                                10 Marks

 

You are required to choose a suitable name/term against each description given in the below table. You are required to write only index numbers (No alphabet) of name/terms in the below table against each description.

 

Note: Solution according to above guidelines will be acceptable only.

 

 

 

 

 

 

 

 

Name/Terms

                                                                                                          

1.      Scheduling                                                                                     

2.      Allocating Resources                                                                      

3.      Planned Finish                                                                                

4.      Schedule Variance                                                                            

5.      Schedule Tracking                                                                          

6.      Status Meeting                                                                                 

7.      Cost of Quality - Appraisal Cost                                                            

8.      Cost of Quality - Prevention Cost                                                        

9.      Formal Reviews                                                                                     

10.   Informal Reviews                                                                         

                                                                                                                                                                             

 

 

 

 

 

 

 

Note: Answer Sheet on next page (Scroll Down)

 

 

 

 

 

 

 

 

 

 

 

 

 

Answer Sheet

Note: Zero Marks if

·         Create any other answer sheet format.

·         Write any other alphabet (character) instead of Numeric index number.

 

 

 

Name / Terms

Descriptions

 

 

Project work is arranged in such a manner where every team member knows which task he/she will be performing. It helps an organization to optimistically manage and achieve its strategic goals.

 

It is determined with the identification of effort allocation along with the preset start date for a task, as it helps in developing a schedule for the project.

 

It consists of creating a linkage between the tasks and who will be responsible for doing it. It requires a sequence of milestones and activities which must be completed within a specified period.

 

The intent is to avoid quality problems in a software product. It is associated with the process, feature and product reviews, and quality planning and project management.

 

It is performed in order to control the scope of our project and to make sure its timely completion. It shows us the difference between the cost of work that is performed till date and the cost of work that was scheduled in the planning stage.

 

It helps us to proactively spot different risks and problems that may negatively impact the project deadlines. It helps the project stakeholders to be well aware about the status of the project.

 

To know about the actual progress of  the project compared to the planned work till date, what are the next goals to be achieved, why some required tasks have not been completed within the specified duration and what are the open issues involved.

 

A widely and popularly used method which can be applied numerous times as it is a time saving activity and does not necessarily require to be inscribed. It follows any area of the project that requires improvement.

 

It contributes to identify the cost of conformance. It follows measurements, auditing and evaluations of the intended software product components etc. to ensure customer satisfaction.

 

Helps to clarify whether the intended software requires any necessary changes. An assessment is performed in conformance to requirement specifications and project plans. Some recommendations are made based on the project’s progress.  

 