We are here with you hands in hands to facilitate your learning & don't appreciate the idea of copying or replicating solutions. Read More>>

Looking For Something at vustudents.ning.com? Click Here to Search

www.bit.ly/vucodes

+ Link For Assignments, GDBs & Online Quizzes Solution

www.bit.ly/papersvu

+ Link For Past Papers, Solved MCQs, Short Notes & More


Dear Students! Share your Assignments / GDBs / Quizzes files as you receive in your LMS, So it can be discussed/solved timely. Add Discussion

How to Add New Discussion in Study Group ? Step By Step Guide Click Here.

CS605 Assignment No 01 Spring 2020 Solution & Discussion

+ How to Follow the New Added Discussions at Your Mail Address?

+ How to Join Subject Study Groups & Get Helping Material?

+ How to become Top Reputation, Angels, Intellectual, Featured Members & Moderators?

+ VU Students Reserves The Right to Delete Your Profile, If?


See Your Saved Posts Timeline

Views: 769

.

+ http://bit.ly/vucodes (Link for Assignments, GDBs & Online Quizzes Solution)

+ http://bit.ly/papersvu (Link for Past Papers, Solved MCQs, Short Notes & More)

+ Click Here to Search (Looking For something at vustudents.ning.com?)

+ Click Here To Join (Our facebook study Group)

Replies to This Discussion

Please Discuss here about this assignment.Thanks

Our main purpose here discussion not just Solution

Students having same subject can start discussion here to solve assignment, GDB & Quiz and can clear their concepts until solution is provided. 

 

P.S:    Please always try to add the discussion in proper format title like “CS101 Assignment / GDB No 01 Solution & Discussion Due Date: ___________”

Then copy Questions from assignment file and paste in Discussion.

 

http://bit.ly/vucodes (For Assignments, GDBs & Online Quizzes Solution)

http://bit.ly/papersvu (For Past Papers, Solved MCQs, Short Notes & More)

Click Here to Search (Looking For something at vustudents.ning.com?)

Click Here to Join (Our facebook study Group)

CS605 Software Engineering II Assignment No. 1 Solution by VU ACADEMY

There are many failure factors for the projects. No project suffers from just one failure factor, all projects has multiple problems and many of the factors are related to each other. So, you are required to identify any four project failure factors and also provide guidelines for resolving these failure factors.

Understanding user requirements is an integral part of information systems design and is critical to the success of interactive systems. However, specifying these requirements is not so simple to achieve. Write any four methods by which user requirements are identified. Also mention benefits and drawback of each method.

#CS605
#VU
#Software Engineering
#CS605Assignment
#CS605Solution
#VUAssignment
#Assignment
#AssignmentSolution
#UserRequirement
#RequirementMethod
#ProjectFailure
#FailureFactor
#FailureGuidelines

Dear Students I have Solved and Uploaded the Assignment of CS605. I have also tried to explain it to you.

The biggest issue that comes up when submitting an assignment is copy paste.

To fix this, I have explained in video how we can save copy paste issue by how to do that change in assignment.

  
Question no. 1:                                                                                                                               10 Marks
There are many failure factors for the projects. No project suffers from just one failure factor, all projects has multiple problems and many of the factors are related to each other. So, you are required to identify any four project failure factors and also provide guidelines for resolving these failure factors.
Format of answer should be as follows:
 S. No Failure Factors Guidelines    1    2    3    4  


Question no. 2:                                                                                                                          10 Marks
Understanding user requirements is an integral part of information systems design and is critical to the success of interactive systems. However, specifying these requirements is not so simple to achieve. Write any four methods by which user requirements are identified. Also mention benefits and drawback of each method.ANS:
 S. No Methods Benefits Drawbacks    1    2    3    4  


NOTE: Every student should provide his/her own work, exact copying of the assignment (or some portion of the assignment) from the internet or other students will lead to copy case and zero marks will be awarded. Do not put any query on MDB about this assignment, if you have any query then  email us at CS605@vu.edu.pk 
 

CS605_Assignment_No_01_Solution_Spring_2020

Download the file, Click on the below link

CS605_Assignment_No_01_Solution_Spring_2020

Assignment No. 01
Semester: Spring 2020

CS605 - Software Engineering-II

Total Marks: 20

Due Date: 30/05/2020

Assignment no. 1 covers Lec#1 to Lec#9.

Objectives of Assignment:

  • To learn the basics of Software Project Management concepts.
  • To understand the applications of different SDLC models.

 

Uploading instructions:

  • Your assignment must be in .doc format. (Any other formats like scan images, PDF, Zip, rar, bmp, etc will not be accepted).
  • No assignment will be accepted through email.

 

Rules for Marking:

It should be clear that your assignment will not get any credit if:

·       The assignment is submitted after due date.

·       The submitted assignment does not open or file is corrupted.

·       Your assignment is copied from internet, handouts or from any other student.

   

 

Question no. 1:                   10 Marks

There are many failure factors for the projects. No project suffers from just one failure factor, all projects has multiple problems and many of the factors are related to each other. So, you are required to identify any four project failure factors and also provide guidelines for resolving these failure factors.

Format of answer should be as follows:

S. No

Failure Factors

Guidelines

1

 

 

2

 

 

3

 

 

4

 

 

 

Question no. 2:                                 10 Marks

Understanding user requirements is an integral part of information systems design and is critical to the success of interactive systems. However, specifying these requirements is not so simple to achieve. Write any four methods by which user requirements are identified. Also mention benefits and drawback of each method.

ANS: 

S. No

Methods

Benefits

 Drawbacks

1

 

 

 

2

 

 

 

3

 

 

 

4

 

 

 

 

NOTE: Every student should provide his/her own work, exact copying of the assignment (or some portion of the assignment) from the internet or other students will lead to copy case and zero marks will be awarded. Do not put any query on MDB about this assignment, if you have any query then email us at CS605@vu.edu.pk

Deadline:

Your assignment must be uploaded/submitted on or before 30/05/2020.

Solution idea of CS605:

Question NO.1                                                                      10 Marks

There are many failure factors for the projects. No project suffers from just one failure factor, all projects has multiple problems and many of the factors are related to each other. So, you are required to identify any four project failure factors and also provide guidelines for resolving these failure factors.

Format of answer should be as follows:

S. No

Failure Factors

Guidelines

1

 

Unclear Objectives

Objectives must be precise and realistic so that you and your team know in which direction you are going. A clear vision of your project will attract the support, loyalty and involvement of your project team.

2

 

Incorrect Time Estimate

Plan your projects properly. Always have all your team members in the loop and make sure everyone is on the same page, meeting all set deadlines perfectly.

3

 

Poor Communication

Build a climate of trust by listening to your team. Follow-up meetings and collaborative project management software ensure good communication within the team.

4

 

 

Inexperienced Project Managers

Hire a project manager with experience. This not only helps in dealing with different project risks, but also makes sure the managers are aware of their roles and responsibilities is essential to avoid project failure.

 

 

 

Question NO.2                                                                           10 Marks

Understanding user requirements is an integral part of information systems design and is critical to the success of interactive systems. However, specifying these requirements is not so simple to achieve. Write any four methods by which user requirements are identified. Also mention benefits and drawback of each method.

 

Anaswer: 

S. No

Methods

Benefits

Drawbacks

1

Task/function mapping

Way of selecting functions that are relevant to specific tasks. May be a way to avoid including too many functions.

Knowing when task definitions sufficient. Make include tasks to justify unnecessary functions.

2

User. usability and organizational requirements

Effective way to categories user requirements. Covers user and organizational levels.

May be hard to decide which user requirements fall into. which categories.

3

Prioritization

Ensures that effort is put into the most important aspects of the system.

Poor management of user

expectations may results in the disappointed users.

4

Criteria setting

Way to determine if developed system has met the user requirements.

Not easily to define suitable

criteria. Extensive testing of

achievement may be resource intensive.

CS 605 Assignment 1 Solution Spring 2020

below link

CS 605 Assignment 1 Solution Spring 2020

SmartSelect_20200530-135808_YouTube.jpg

RSS

© 2020   Created by +M.Tariq Malik.   Powered by

Promote Us  |  Report an Issue  |  Privacy Policy  |  Terms of Service

.