We are here with you hands in hands to facilitate your learning & don't appreciate the idea of copying or replicating solutions. Read More>>
+ Link For Assignments, GDBs & Online Quizzes Solution |
+ Link For Past Papers, Solved MCQs, Short Notes & More |
Dear Students! Share your Assignments / GDBs / Quizzes files as you receive in your LMS, So it can be discussed/solved timely. Add Discussion
How to Add New Discussion in Study Group ? Step By Step Guide Click Here.
CS615 Current Final Papers at One Place From March 01 to March 12, 2014
Tags:
+ How to Follow the New Added Discussions at Your Mail Address?
+ How to Join Subject Study Groups & Get Helping Material? + How to become Top Reputation, Angels, Intellectual, Featured Members & Moderators? + VU Students Reserves The Right to Delete Your Profile, If?.
+ http://bit.ly/vucodes (Link for Assignments, GDBs & Online Quizzes Solution)+ http://bit.ly/papersvu (Link for Past Papers, Solved MCQs, Short Notes & More)
+ Click Here to Search (Looking For something at vustudents.ning.com?) + Click Here To Join (Our facebook study Group)Faisal Dar thank you very much bro but how it would be nice if you could also write about the MCQs too, my paper is tomorrow and i could not find any clue till now, no one is here to draw about the paper sketch, but strange every one wants to know about paper, WHEN YOU WILL NOT WRITE HERE ABOUT YOUR ONE, HOW COULD YOU EXPECT TO READ ABOUT YOUR ONE.
faisal bahi salam cs615 ki assignment upload ker k discussion start kren plzzzzzzzzzzzz
MCQs mostly were new but related ones
and
what is reengineering?
Characteristics of high-level WBS?
steps of spliting unit task
risk projection
wht is organization
SMARTER
solved questions of cs615..
# Amina Shah
thank you
Jeo hazaro saal
1.. what is reengineering? (2 MARKS)
Reengineering is a process of abstraction of a new system from an old system.
2.. List names of network scheduling techniques. (2 MARKS)
• PERT and
• CPM
3.. List four names of software design attributes. (2 MARKS)
Data structure,
– Software architecture,
– Interface representations, and procedural (algorithmic) detail.
4.. Characteristics of high-level WBS? Any three (3 MARKS)
Software development
Design
Implementation
Integration
Testing
5.. Steps of split the unit testing task? Any three (3 MARKS)
To split the Unit testing task, you perform the following steps:
1. Create a task named Unit testing below the Testing summary task.
2. Select the Unit testing task.
3. Click the Edit menu.
The Edit menu contains the command that enables you to split a task.
4. Click the Split Task command on the Edit menu.
Upon clicking the Split Task command, the shape of the cursor changes. In
addition, a small yellow box with a tool tip suggesting how to split a task
hovers on the task view of the Microsoft Project window.
5. Drag the changed mouse cursor over the task in the Gantt chart view.
7.. Project-related risk? (2 MARKS)
project related risks are incomplete requirements, unclear project
deliverables and objectives, and complexity of the product.
8.. elaborate risk components? (5 MARKS)
Risk Components and Drivers
The U.S. Air Force [AFC88j has written a pamphlet that contains excellent guidelines (or
software risk 1dentification and abatement. The Air Force approach requires that the
project manager identify the risk drivers that affect software risk components-
Performance, cost, support, and schedule.
© 2019 Created by + M.Tariq Malik.
Powered by
Promote Us | Report an Issue | Privacy Policy | Terms of Service
VU Students reserves the right to delete profile, which does not show any Activity at site nor has not activity more than 01 month.
We are user-generated contents site. All product, videos, pictures & others contents on vustudents.ning.com don't seem to be beneath our Copyrights & belong to their respected owners & freely available on public domains. We believe in Our Policy & do according to them. If Any content is offensive in your Copyrights then please email at m.tariqmalik@gmail.com or Contact us at contact Page with copyright detail & We will happy to remove it immediately.
Management: Admins ::: Moderators
Awards Badges List | Moderators Group
All Members | Featured Members | Top Reputation Members | Angels Members | Intellectual Members | Criteria for Selection
Become a Team Member | Safety Guidelines for New | Site FAQ & Rules | Safety Matters | Online Safety | Rules For Blog Post