Dear Students,

This is to inform that quiz 02 will be opened on 17th May, 2017 and last date to attempt quiz will be 19th May, 2017.

Instructions:

  • You can start attempting the quiz at any time but within given date(s) by clicking the quick link for Quiz on VULMS as it will become enabled within the mentioned dates.  As soon as the time will be over, it will automatically be disabled and will not be available to attempt it. 
  • Quiz will be based on Multiple Choice Questions (MCQs). Covering video Lectures 8 to 15.  
  • Each question has a fixed time limit of 90 seconds. So you have to save your answer before 90 seconds. But due to unpredictable/unstable Internet speed, it is strongly recommended that you save your answer within 60 seconds to avoid any inconvenience. While attempting a question, keep an eye on the remaining time. 
  • Attempting quiz is unidirectional. Once you have moved forward to the next question, you will not be able to go back to the previous one. Therefore before moving to the next question, make sure that you have selected the best option and saved your answer. 
  • DO NOT press back button of your browser or refresh the page while attempting a question. Otherwise you will lose the chance of attempting the current question and a new question will be loaded. 
  • DO NOT try to disable “Java Script” in your browser; otherwise you will not be able to attempt the quiz. 
  • If for any reason, you lose access to Internet (like power failure or disconnection of Internet); you will be able to attempt the quiz again but from the next question where you left in last attempt. But remember that you have to complete the quiz before expiry of the deadline. 

best of luck.


+ http://bit.ly/vucodes (Link for Assignments, GDBs & Online Quizzes Solution)

+ http://bit.ly/papersvu (Link for Past Papers, Solved MCQs, Short Notes & More)

+ Click Here to Search (Looking For something at vustudents.ning.com?)

+ Click Here To Join (Our facebook study Group)


Views: 533

Replies to This Discussion

Please all students related this subject Share your online Quizzes here to help each other.thanks

my quiz 

  • Which of the following presents the risks and returns associated with the project so the prospective members can evaluate them?
  • Which of the following ingredient for winning proposal helps to understand the project, contains the owner’s real wants, and is prepared to satisfy him/her?
  • Which of the following should not be conducted as a forum merely to support a desire that the project will be successful?
  • All of the following are examples of Inquiry documents EXCEPT:
  • Which of the following is the discount rate that equates the present values of the two sets of flows?
  • Which of the following refers to a narrative description of the work to be accomplished?
  • “A construction firm can select the best subset of a large group of potential projects on which to bid” is an example of which of the following?
  • Which of the following is the content of the”Administrative Support” part of the project proposal?
  • The Kala Bagh Dam project could not be started because it was not feasible ______.
  • Which of the following should be the quality of the proposal Project Manager?



      MGMT627

    QUIZ#2

1. In which of the following approaches, project is characterized in mathematical model to estimate costs?

Top Down Approach

Bottom Up Approach

 2. “If your Proposal is not selected, you determine where you went wrong”. This strategy is known as:

Postmortem

Response

Disclosure

Creativity

 

3. Which of the following is also referred as net present value method?

Discounted Cash Flow

Pay Back Period

Discounted Cash Flow

Internal Rate of Return

4. Between projects A and B, project A will be considered a superior financial undertaking if it has:

A shorter payback period than project B.

A lower average rate of return than project B.

A lower net present value than project B.

A longer payback period than project B.

5. Which of the following is a preliminary analysis done to determine what will be required to satisfy the need?

Need analysis

Process Work

Engineering & Design

Cost Estimate

6. Which of the following presents the risks and returns associated with the project so the prospective members can evaluate them?

Project Plan

Scope statement

Feasibility Study

Work Breakdown Structure

7. A project manager is using the internal rate of return method to make the final decision on which project to undertake. Which of these four projects have the highest internal rate of return?

$25,000 initial outlay with $10,000 cash inflows during the following five years

$12,500 initial outlay with $10,000 cash inflows during the following five years

$25,000 initial outlay with $5,000 cash inflows during the following five years

$12,500 initial outlay with $5,000 cash inflows during the following five years

8. Which of the following skills should be possessed by Proposal Publication Staff for preparing future proposals?

Editing

Use of word Processing

Preproduction equipment

All of the given options

9. Which of the following is the first step in the process of defining the actual scope of a project?

Project Conception

Feasibility analysis

Scope statement

Project Planning

10.All of the following are the goals of project planning EXCEPT:

To develop expertise in a given area 

To become competitive 

To modify an existing facility for later use

To prepare work breakdown structure

RSS

Latest Activity

+ıllıllı ᎶᏋᏁᎥᏬᏕ ᏰᎥᏒᎴ ıllıllı+ liked jawad's discussion Tum Se pahle woh Jo shaks takat nashin tha || Habib jalib poetry|| Urdu poetry
3 minutes ago
+ıllıllı ᎶᏋᏁᎥᏬᏕ ᏰᎥᏒᎴ ıllıllı+ liked Miss. Churhail's discussion NAFRATON K AINY PE BARI DHOOL JAMI HY!!!!
7 minutes ago
+ıllıllı ᎶᏋᏁᎥᏬᏕ ᏰᎥᏒᎴ ıllıllı+ replied to zohaib iftikhar's discussion ...;KIA KISI K NASEEB KHARAB HO SAKTY HAIN?...;
10 minutes ago
+ıllıllı ᎶᏋᏁᎥᏬᏕ ᏰᎥᏒᎴ ıllıllı+ liked zohaib iftikhar's discussion ...;KIA KISI K NASEEB KHARAB HO SAKTY HAIN?...;
11 minutes ago
+ıllıllı ᎶᏋᏁᎥᏬᏕ ᏰᎥᏒᎴ ıllıllı+ replied to Miss. Churhail's discussion HIPPOCAMPUS YANI MEMORY!!!
12 minutes ago
+ıllıllı ᎶᏋᏁᎥᏬᏕ ᏰᎥᏒᎴ ıllıllı+ liked Miss. Churhail's discussion HIPPOCAMPUS YANI MEMORY!!!
12 minutes ago
+ıllıllı ᎶᏋᏁᎥᏬᏕ ᏰᎥᏒᎴ ıllıllı+ replied to Omar's discussion Eyes and Hearts
13 minutes ago
+ıllıllı ᎶᏋᏁᎥᏬᏕ ᏰᎥᏒᎴ ıllıllı+ liked Omar's discussion Eyes and Hearts
13 minutes ago
+ıllıllı ᎶᏋᏁᎥᏬᏕ ᏰᎥᏒᎴ ıllıllı+ replied to 乇メ-丂イひり3刀イ.'s discussion *** My Drawing ***
16 minutes ago
+ıllıllı ᎶᏋᏁᎥᏬᏕ ᏰᎥᏒᎴ ıllıllı+ liked 乇メ-丂イひり3刀イ.'s discussion *** My Drawing ***
17 minutes ago
Hira replied to +M.Tariq Malik's discussion MGMT627 GDB Fall 2020 Solution & Discussion Last Date: 26-11-2020 in the group MGMT627 Project Management
31 minutes ago
Hira joined +M.Tariq Malik's group
31 minutes ago

Looking For Something? Search Here

© 2020   Created by +M.Tariq Malik.   Powered by

Promote Us  |  Report an Issue  |  Privacy Policy  |  Terms of Service

.