Latest Activity In Study Groups

Join Your Study Groups

VU Past Papers, MCQs and More

We non-commercial site working hard since 2009 to facilitate learning Read More. We can't keep up without your support. Donate.

ASSIGNMENT NO 1(MTH 601)
Maximum Marks: 10
Due Date: 13th November, 2017
DON’T MISS THESE: Important instructions before attempting the solution of this
assignment:
 To solve this assignment, you should have good command over 1 - 9 lectures.
 Upload assignments properly through LMS, No Assignment will be accepted
through email.
 Write your ID on the top of your solution file.
 Don’t use colorful back grounds in your solution files.
 Always send your solution in dox or docx file with proper accessible math type
symbols.
 You should remember that if we found the solution files of some students are
same then we will reward zero marks to all those students.
 Also remember that you are supposed to submit your assignment in Word format
any other like scan images etc will not be accepted and we will give zero marks
correspond to these assignments.


Question No 1: Marks=05
a) Construct a table for the network diagram given below which describe the relationship between
activities and predecessors activities.
b) Find the critical path and the total project duration of the project.


Question No 2: Marks=05
Find the expected time and the variance for each activity.

Activity

Optimistic time (t0)

Most likely time(tm)

Pessimistic time(tp)

A

2

5

8

B

4

9

14

C

1

3

5

D

4

5

12

Views: 5087

Attachments:

Replies to This Discussion

jazakAllah

MTH601 Assignment No.1 Solution

Attachments:

MTH601 Assignment#01 Solution

RSS

Looking For Something? Search Below

Latest Activity

© 2022   Created by + M.Tariq Malik.   Powered by

Promote Us  |  Report an Issue  |  Privacy Policy  |  Terms of Service