We are here with you hands in hands to facilitate your learning & don't appreciate the idea of copying or replicating solutions. Read More>>

Looking For Something at vustudents.ning.com? Click Here to Search

www.bit.ly/vucodes

+ Link For Assignments, GDBs & Online Quizzes Solution

www.bit.ly/papersvu

+ Link For Past Papers, Solved MCQs, Short Notes & More


Dear Students! Share your Assignments / GDBs / Quizzes files as you receive in your LMS, So it can be discussed/solved timely. Add Discussion

How to Add New Discussion in Study Group ? Step By Step Guide Click Here.

WORLD'S FIRST SOLAR POWERED
STADIUM IN TAIWAN

Taiwan recently finished construction on a solar-powered stadium that will generate 100% of its electricity from photovoltaic technology Designed by Toyo Ito, the 50,000-seat arena will officially open later this year to welcome the 2009 World Games which features many sports not included in the Olympics Such as parachuting, tenpin bowling and rugby sevens.
Toyo Ito’s design has a 14,155 sq metre solar roof that is able to provide enough energy to power the stadium’s 3,300 lights and two jumbo vision screens. Its dragonesque roof is covered by 8'844 solar panels, ready to supply the enormous record-breaking building with clean power.
It has incredible 14,155m2 roof which could potentially generate 1.14 gigawatt hours of electricity every year; enough electricity to power up to 80% of the surrounding neighbourhood after being fed into the grid on the days when the stadium is unused.


A couple of years ago, we wrote about a 1.3 megawatt solar-powered stadium in Switzerland. A new solar powered stadium has been built in Taiwan for the 2009 World Games in July. Designed by Japanese architect Toyo Ito, the stadium incorporates 8,844 solar panels on the roof. The roof will generate enough energy to power the building’s 3,300 lights and two giant television screens.

On hot days, the stadium will generate more power than it needs, so the Taiwanese government plans to sell the excess capacity. A Taiwanese official said that the panels will generate 1.14 million KWh per year, preventing 660 tons of annual carbon dioxide.

The power system was tested in January. It took over six minutes to power up the lighting in the stadium, which illuminates the track and field with 3300 lux.


The stadium has a some other green features — permeable pavement is used throughout the complex, and all the raw materials used in the main stadium are reusable and made in Taiwan.




+ How to Follow the New Added Discussions at Your Mail Address?

+ How to Join Subject Study Groups & Get Helping Material?

+ How to become Top Reputation, Angels, Intellectual, Featured Members & Moderators?

+ VU Students Reserves The Right to Delete Your Profile, If?


See Your Saved Posts Timeline

Views: 58

.

+ http://bit.ly/vucodes (Link for Assignments, GDBs & Online Quizzes Solution)

+ http://bit.ly/papersvu (Link for Past Papers, Solved MCQs, Short Notes & More)

+ Click Here to Search (Looking For something at vustudents.ning.com?)

+ Click Here To Join (Our facebook study Group)

Comment

You need to be a member of Virtual University of Pakistan to add comments!

Join Virtual University of Pakistan

© 2020   Created by + M.Tariq Malik.   Powered by

Promote Us  |  Report an Issue  |  Privacy Policy  |  Terms of Service

.